The Goat 740 ADU
Core Construction · Sacramento ADU Specialist · Since 1991

Designing the Perfect ADU

Layouts, Budgets & Buildouts — everything Sacramento homeowners need to know before building.

Get a Free Consultation
$1,500–$2,500
Monthly rental income
Sacramento market (2026)
20–30%
Property value increase
from a permitted ADU
95%
Average occupancy rate
ADU rentals in Sacramento
$118,440
Avg. equity added to a
$423K Sacramento home
35+
Years serving Sacramento
Est. 1991 · Lic. #993478
The Basics

What Is an ADU?

An Accessory Dwelling Unit is a fully independent living space — with its own kitchen, bath, and entrance — built on your existing residential lot. In Sacramento, they're now easier to build than at any point in history.

🏡

Detached ADU

Stand-alone structure in your backyard. Most popular, most versatile. Maximum rental income potential.

🏠

Attached ADU

Addition to your main home with its own entrance. Shares one wall. Cost-effective on smaller lots.

🚗

Garage Conversion

Convert your existing garage into livable space. Often the most affordable option — no new footprint.

The Goat 740™

Core Construction's signature 740 sq ft ADU. 1–2 bed, vaulted ceilings, 2 patios. From $169,000.

Key Sacramento Facts

No owner-occupancy requirement — you can rent BOTH your main home and your ADU
Ministerial permit approval — no neighbor input, no discretionary design review needed
Up to 2 detached ADUs + 1 Junior ADU allowed on most single-family lots under state law
HOA cannot block ADU construction — California state law overrides HOA rules
Impact fees waived for ADUs under 750 sq ft in Sacramento County
Choosing the Right Fit

Layout Options

The right ADU layout depends on your lot size, setbacks, goals, and budget. Here's how the main options compare.

Type Size Est. Cost Best For Timeline
Detached ADU400–1,200 sf$150K–$350K+Max income · privacy · independence10–16 months
Attached ADU300–800 sf$100K–$220KSmaller lots · shared utility savings8–12 months
Garage Conversion300–600 sf$60K–$140KLowest cost · fastest · existing footprint4–8 months
Junior ADUUp to 500 sf$40K–$90KInterior conversion · lowest entry cost3–6 months
The Goat 740™740 sfFrom $169,0001–2 bed · vaulted ceilings · 2 patios~10 months

💡 Core Tip: Every lot is different — setbacks, utility locations, and soil conditions vary by property. A free feasibility assessment tells you exactly what's possible on YOUR lot before you spend a dollar.

Where the Money Goes

Budget Breakdown

A realistic look at ADU costs in Sacramento — category by category.

Cost by Category

25–35%
Construction & Labor
Framing, roofing, insulation, finishes
15–20%
Foundation & Site Work
Excavation, concrete, grading
12–18%
Mechanical (MEP)
Plumbing, electrical, HVAC
10–15%
Cabinetry & Fixtures
Kitchens, baths, custom built-ins
8–12%
Design & Architecture
Plans, engineering, structural
5–10%
Permits & Fees
City/county fees, inspections
5–8%
Utility Connections
Water, sewer, electrical panel
5–10%
Contingency — NEVER SKIP
Buffer for unexpected conditions

Sample Budgets

Entry Level
Garage conversion or Junior ADU
$50K – $120K
Lowest risk · fastest ROI · limited size
Mid-Range
Attached or small detached ADU
$120K – $220K
Best balance of cost vs. rental income
Premium
Full custom detached ADU
$220K – $400K+
Max income · max value · long lifespan

⚠️ Always budget 8–10% contingency. Utility upgrades alone can add $8,000–$20,000.

Step by Step

The Build Process

What to expect from first conversation to move-in day — no surprises, no mystery.

1
Free Consultation & Feasibility
Week 1
Lot assessment, zoning check, setback review. Zero cost, zero commitment.
2
Design & Architectural Plans
Weeks 2–6
In-house design team creates permit-ready plans tailored to your lot.
3
Permit Submission
Weeks 6–8
We prepare and submit the full permit package to your city or county.
4
Permit Approval
4–16 weeks
Sacramento typical: 8–14 weeks. Impact fees waived for ADUs under 750 sf.
5
Site Prep & Foundation
Weeks 1–3 of build
Grading, excavation, concrete pour — the most critical phase for quality.
6
Framing & Rough MEP
Weeks 3–7
Structure goes up. Plumbing, electrical, and HVAC rough-in happens here.
7
Inspections
Multiple stages
City inspectors sign off at each phase — foundation, framing, MEP, final.
8
Finishes & Cabinetry
Weeks 7–12
Custom Core cabinetry, tile, flooring, fixtures, and paint go in.
9
Final Inspection & Certificate
Week 12–16
Certificate of Occupancy — your ADU is now legally rentable.
10
Keys & Move-In
First day of income
Total: 10–16 months for detached ADU. Garage conversions: 4–6 months.
The Financial Case

Your Return on Investment

Real Sacramento numbers — what your ADU investment returns over time.

The Goat 740™ — Real Example

InvestmentFrom $169,000
Size740 sq ft · 1–2 Bed · 1 Bath
Est. Monthly Rent$1,800–$2,200
Annual Income$21,600–$26,400
Payback Period7–9 years
Equity Added~$118,000+
10-Year ROI~140–180%

$18,000–$30,000 per year in passive income. Your ADU can pay itself off in under 10 years.

Why Homeowners Build ADUs

67%
Rental Income
Offset mortgage · build passive wealth
18%
Family / Multi-gen
Aging parents · adult children · privacy
9%
Home Office / Studio
Dedicated workspace · no commute
6%
Property Value
Invest in equity · plan for future sale
Before You Sign Anything

Top Mistakes Homeowners Make

Learn from others — these are the most common and costly ADU errors in Sacramento.

01
❌ Skipping the feasibility study
Every lot is different. Setbacks, utility locations, and soil conditions vary. Homeowners who skip this step often discover costly surprises mid-project.
02
❌ Choosing a contractor based on price alone
The lowest bid is rarely the best value. Unlicensed contractors leave you with unpermitted work, failed inspections, and a structure that undermines your home's value.
03
❌ Underestimating the budget — especially utilities
Utility connections are the most overlooked cost. Electrical panel upgrades alone can add $8,000–$20,000 and weeks to your timeline.
04
❌ Not planning for the right tenant or use
Long-term rental? Family housing? Home office? Each changes the layout you need. Know your goal before you finalize the design.
05
❌ Ignoring access, privacy and natural light
Poorly sited ADUs are harder to rent at full market rate. Access, privacy from the main home, and natural light significantly affect rental value.
06
❌ Using fragmented design, permit and build teams
Separate architect + permit expediter + contractor creates accountability gaps. An integrated design/build firm owns every outcome.
Due Diligence

Questions to Ask Your Contractor

Don't hire anyone who can't answer all of these clearly and confidently.

❓ Are you licensed, bonded and insured in California?
→ Verify at CSLB.ca.gov — takes 30 seconds and protects everything.
❓ Have you built ADUs in Sacramento County specifically?
→ Local permit experience cuts weeks off your timeline.
❓ Do you handle design, permits AND construction in-house?
→ One team = one point of accountability. No finger-pointing.
❓ Can you provide 3 completed ADU references I can call?
→ Call them — ask if it was on time, on budget, and what went wrong.
❓ What is included in the contract — and what is NOT?
→ Appliances, landscaping, and utility hookups are commonly excluded.
❓ What is your change-order process if costs increase?
→ Every project has unknowns. A professional has a clear, fair process.
❓ Who is my direct point of contact throughout the project?
→ Insist on direct access to the owner or a dedicated project manager.
❓ What is a realistic timeline — and what could extend it?
→ If someone says 6 months for a full detached ADU, be skeptical.

Ready to Build Your ADU?

Start with a free, no-pressure consultation and lot assessment. We'll tell you exactly what's possible on your property — and what it will cost.

📞
Call Us
916.719.9979
📧
Email
darko@corebg.com
🌐
Website
corebg.com/adu
💰
Starting At
$169,000
Call Now — Free Consultation
Free consultation QR
Free Consultation
ADU page QR
View ADU Page
Website QR
corebg.com